Project Information Conditions Survey Of Jabel Ali Port 01 Client DP World 02 Our Role Conditions Survey SCOPE OF WORK Site condition inspection Determining level of damage on the berths and infrastructure Defining the Client’s needs Determining of the service life of existing structures RCA report for the settlement of the block wall quay Project Gallery Post navigation Previous PortfolioThe Port Of Novi Sad, Serbia Next PortfolioPort Rashid Infrastructure Network